Prepare
Set out the installation area and organise steelwork, access equipment and lifting operations.
Current project / Confidential facility
Installing structural steelwork, access systems and industrial cooling equipment for a confidential food-production facility.

The project
AMCO is delivering the mechanical installation around industrial cooling equipment, including the galvanised support structure, access steelwork and the controlled lifting and positioning of large cooling units.
This project remains in progress. The photographs provide a live record of the installation rather than a completed-project claim.
Installation sequence
Set out the installation area and organise steelwork, access equipment and lifting operations.
Assemble the galvanised support and access structure within the cooling room.
Lift and accurately place the cooling units onto their engineered supports.
Continue the mechanical installation towards equipment integration and handover.
Site record





Planning an installation?
Talk directly with our directors about cooling systems, production-line installation or engineering projects.
Discuss your project ↗